Tunnel Siegkreisel, Betzdorf

The Project:


Construction of a 360 m long tunnel with three lanes as component of a municipal bypass system; completion: Spring, 2006.


Executing company:

ARGE Tunnel Tunnel Siegkreisel, Betzdorf

Hochtief Construction AG

Kirchner Bau GmbH

Alpine Bau Deutschland GmbH


The Problem:


Pumping off of the water arising during the underground tunnel heading.


Our Solution:


Use of submersible pumps of type KTZ32.2, these being operated in permanent snore mode (dry running) during the complete construction period. This application is no problem for the pump thanks to the patented oil distributor in combination with the rotating mechanical seal, which is located completely internally.

В случай на утилизация на абразивни и корзивни материали, в определени компоненти естествено ще настъпи по-значително износване. По отношение на горепосоченото приложение, износването може да настъпи главно в импелер, агитатор, смукателна плоча, втулка на вала, маслен пръстен, механично уплътнение, корпус на помпата, филтър, корпус на двигателя и смукателен съединител. В зависимост от условията на работа, животът на тези части може да варира значително и може да бъде по-кратък от законовия гаранционен период.
В тази връзка, моля, обърнете внимание на нашите общи условия , които също ви изпратим по пощата при поискване.