Katzenberg Tunnel, Germany

The project:


Treatment and desludging of the process water from the tunnel advance.


Executing company:

Ed. Züblin Umwelttechnik GmbH


The problem:


The fluctuating accumulation of the sludge water from the Katzenberg Tunnel advance is collected in intermediate tanks. The accumulating process water should be pumped into the water treatment plant using submersible pumps.


The solution:


Tsurumi series KTZ contractors' pumps were chosen due to their reliability. Continuous, non-stop operation with high concentrations of sediment is possible with Tsurumi contractors' pumps, securing the operation of the water treatment plant.

В случай на утилизация на абразивни и корзивни материали, в определени компоненти естествено ще настъпи по-значително износване. По отношение на горепосоченото приложение, износването може да настъпи главно в импелер, агитатор, смукателна плоча, втулка на вала, маслен пръстен, механично уплътнение, корпус на помпата, филтър, корпус на двигателя и смукателен съединител. В зависимост от условията на работа, животът на тези части може да варира значително и може да бъде по-кратък от законовия гаранционен период.
В тази връзка, моля, обърнете внимание на нашите общи условия , които също ви изпратим по пощата при поискване.