Intermediate access gallery, Stelzen, Germany

The project:


Construction of the Stelzen intermediate access gallery during the building of the Blessberg railway tunnel.


Executing company:

Alfred Kunz Untertagebau GmbH


The problem:


Tunnel drainage under difficult conditions: long adits with a minimum of available space.


The solution:


Type KTZ35.5 pumps were installed in the pipeline as booster pumps. This special solution can be easily implemented with any of our standard contractors' pumps.

Thanks to the simple construction and the patented oil lifter, Tsurumi contractors' pumps can run dry absolutely trouble-free. The minimal cooling due to the flowing medium is sufficient.

При употреба на абразивни и корозивни материали, в някои компоненти естествено ще се появи силно износване. Във връзка с по-горното приложение, износване ще възникне предимно в импелера, агитатора, засмукващата плоча, ръкава на вала, масления пръстен, механичното уплътнение, корпуса на помпата, цедката, корпуса на двигателя и смукателния куплунг. В зависимост от условията на работа на експлоатационният живот на официалния гаранционен срок.