Construction of an office building, Spreeport

The Project:


Construction of an office building, 1st construction phase


Executing company:

HOCHTIEF Construction AG, Niederlassung Berlin

Responsible for setting up the construction site and for the technical equipment:

STREIF Baulogistik GmbH, Niederlassung Ost


The Problem:


Pumping off the storm water arising on the roofs during the construction phase.


Our Solution:


Eight type KTVE21.5 pumps with integrated electrode controls were installed in the shafts. The slim electrodes, which are attached, replace float sensors which take a lot of space and are maintenance-intensive. Only the motor line of the pump has to be relaid; no additional cables for float switches have to be connected.

При употреба на абразивни и корозивни материали, в някои компоненти естествено ще се появи силно износване. Във връзка с по-горното приложение, износване ще възникне предимно в импелера, агитатора, засмукващата плоча, ръкава на вала, масления пръстен, механичното уплътнение, корпуса на помпата, цедката, корпуса на двигателя и смукателния куплунг. В зависимост от условията на работа на експлоатационният живот на официалния гаранционен срок.
В тази връзка, моля, обърнете внимание на нашите общи условия които ние също ще ви изпратим по пощата при поискване.