Construction of a new culvert, Kleuterbach, Germany

The Project:


Replacement construction of the Kleuterbach culvert


Executing companies:

Johann Bunte GmbH&Co. KG

Bad Bentheim branch


The problem:


At km 42.431 N the Dortmund-Ems Canal passes over the upper Kleuterbach culvert. The planned channel widening of the Lüdinghausen–Senden section requires that the existing culvert be replaced. This will be built using the immersed-tube-method throughout its length. Submersible pumps will be necessary for floatingthe steel pipe culverts into place and sinking them.


The solution:


Pumps of types KTZ47.5 and KRS2-69 were used to control the flooding of the steel pipes and to sink them accurately.

При употреба на абразивни и корозивни материали, в някои компоненти естествено ще се появи силно износване. Във връзка с по-горното приложение, износване ще възникне предимно в импелера, агитатора, засмукващата плоча, ръкава на вала, масления пръстен, механичното уплътнение, корпуса на помпата, цедката, корпуса на двигателя и смукателния куплунг. В зависимост от условията на работа на експлоатационният живот на официалния гаранционен срок.
В тази връзка, моля, обърнете внимание на нашите общи условия които ние също ще ви изпратим по пощата при поискване.