Cologne/Bonn airport connection, Germany

The Project:


Connection of the newly built road for Cologne/Bonn airport

Executing Company

Heitkamp GmbH, Wayss&Freytag AG,

Trapp GmbH


The Problem:


Maintainance of water level in a rainwater storage basin at the building site.


Our Solution:


Installation of 2 submersible pumps KTVE21.5 and KTVE22.2. The advantage here is in the integrated level control unit via electrodes. A separate floater cable does not have to be laid. The space required is determined by the diameter of the pump. In contrast to floaters, electrodes do not have to be readjusted. The level can be varied without any difficulty by mounting a screw.

При употреба на абразивни и корозивни материали, в някои компоненти естествено ще се появи силно износване. Във връзка с по-горното приложение, износване ще възникне предимно в импелера, агитатора, засмукващата плоча, ръкава на вала, масления пръстен, механичното уплътнение, корпуса на помпата, цедката, корпуса на двигателя и смукателния куплунг. В зависимост от условията на работа на експлоатационният живот на официалния гаранционен срок.
В тази връзка, моля, обърнете внимание на нашите общи условия които ние също ще ви изпратим по пощата при поискване.