Augustaburg tunnel, Erfurt

The Project:


Construction of a railway tunnel with a length of 1480 m.


Executing companies:

ARGE Tunnel Augustaburg, Erfurt

Hochtief Construction AG, Frankfurt

Alpine Bau Deutschland GmbH


The Problem:


Drainage during the underground tunnel heading.


Our Solution:


A Use of type KTZ32.2 submersible pumps operated in 24-hour snore mode for drainage purposes during the tunnel heading. Thanks to their special properties including their internal rotating mechanical seal and upstream shaft protection sleeve with seal, the Tsurumi pumps can be operated in 24-hour snore mode.


The advantages of this design are:

  • Extended service lives
  • Lower costs for spare parts
  • Lower labour costs
При употреба на абразивни и корозивни материали, в някои компоненти естествено ще се появи силно износване. Във връзка с по-горното приложение, износване ще възникне предимно в импелера, агитатора, засмукващата плоча, ръкава на вала, масления пръстен, механичното уплътнение, корпуса на помпата, цедката, корпуса на двигателя и смукателния куплунг. В зависимост от условията на работа на експлоатационният живот на официалния гаранционен срок.