Direkt zum Inhalt | Direkt zur Navigation

Bad Wurzach treatment plant, Germany

The Project:

Eintürnen pumping station of the Bad Wurzach treatment plant


Contractor:

Hurter, Leutkirch


Tsurumi support:

Ernst Mutzel (Field Sales Baden-Württemberg)


The Problem:

The pumping station has always had problems with clogging, and the treatment-plant workers sometimes have to clean the pumps several times a week. Pumps from different manufacturers were tested, but with no improvement in the situation.


The Solution:

Use of a type 100C43.7 cutter pump with a tungsten-carbide blade built into the impeller. This pump shifts large quantities of wastewater and shreds fibrous materials using the built-in cutting mechanism. After ten months, there was not a single case of clogging.

При употреба на абразивни и корозивни материали, в някои компоненти естествено ще се появи силно износване. Във връзка с по-горното приложение, износване ще възникне предимно в импелера, агитатора, засмукващата плоча, ръкава на вала, масления пръстен, механичното уплътнение, корпуса на помпата, цедката, корпуса на двигателя и смукателния куплунг. В зависимост от условията на работа на експлоатационният живот на официалния гаранционен срок.
В тази връзка, моля, обърнете внимание на нашите общи условия които ние също ще ви изпратим по пощата при поискване.