Direkt zum Inhalt | Direkt zur Navigation

Lindner-Werke, Dettelbach, Germany

The Project:


Industrial manufacture of gypsum fibreboard panels


Companies involved:

Lindner GFT GmbH

Grebner Reinigungssysteme (Cleaning Systems)


The Problem:


Pumping of residual water containing gypsum from the production process, with a solids content of 15-20%. The pumps are required to operate in "on-snore-mode", with fluctuating delivery volumes.


The Solution:


Use of one pump each of the types KTV2-50 and KTV2-80 with stirring systems (weight 24kg and 37kg in each case). These types are easy to clean and, with the aid of the stirring systems, can pump water containing solids without any problems. First maintenance was carried out after 16 months, and the oil was absolutely perfect. The only replacements made were the shaft protection sleeve, the shaft sealing ring and the rubber parts of the pump housing.

При употреба на абразивни и корозивни материали, в някои компоненти естествено ще се появи силно износване. Във връзка с по-горното приложение, износване ще възникне предимно в импелера, агитатора, засмукващата плоча, ръкава на вала, масления пръстен, механичното уплътнение, корпуса на помпата, цедката, корпуса на двигателя и смукателния куплунг. В зависимост от условията на работа на експлоатационният живот на официалния гаранционен срок.
В тази връзка, моля, обърнете внимание на нашите общи условия които ние също ще ви изпратим по пощата при поискване.