Drainage near the Rhone, Lyon, France

The Project:

The project is based in the downtown of Lyon and at the corner of a crossroads. Urban density is high and the lanes are nearby. The site is located approximately 350m from the Rhone river. The work consists of creating a well-point system about 1,2 m deep, so that the soil reinforcement can be completed and the excavation of bottom material be excavated properly after the rubble have become dry.


The Problem:

The complexity of the project is caused by continuing reinforcement of the soil under the groundwater level and excavation of rubble to allow the creation of a second level of basement. All these works can only be carried out in a dry environment, it was necessary to establish a system of continuous pumping during the work under this condition.


The Solution:

Our client has completed the installation of strainer wells and four Contractors' pumps Tsurumi KRS822 were implemented. They pump about 200 m3/h to 23m of head. The wells are connected by pipes of DN150. This facility operates 24/7 and it is under constant surveillance. To date no action on the pumps had to be done.

В случай на утилизация на абразивни и корзивни материали, в определени компоненти естествено ще настъпи по-значително износване. По отношение на горепосоченото приложение, износването може да настъпи главно в импелер, агитатор, смукателна плоча, втулка на вала, маслен пръстен, механично уплътнение, корпус на помпата, филтър, корпус на двигателя и смукателен съединител. В зависимост от условията на работа, животът на тези части може да варира значително и може да бъде по-кратък от законовия гаранционен период.
В тази връзка, моля, обърнете внимание на нашите общи условия , които също ви изпратим по пощата при поискване.