- Acceuil >
- Tunisie >
- rapports des utilisations >
- 2010
2010
Lindner-Werke, Dettelbach, Germany
Industrial manufacture of gypsum fibreboard panels
Plus amples informationsSurface suction removal, Wallenhorst, Germany
Suction withdrawal of foam and floating dirt particles from the surface of the basin
Plus amples informationsDealer support, Lingen, Germany
Holding of an open day at a key dealership
Plus amples informationsPump Testing Days, Fürth, Germany
Pump testing days in-house at Gebr. Mayer, electrical and mechanical testing
Plus amples informationsBibra Tunnel, Germany
The Bibra Tunnel is part of the German Unit No. 8 construction project, the extension stretch on the route Nuremberg-Erfurt-Leipzig-Berlin
Plus amples informationsOn-site training, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Plus amples informationsPumped Storage Power Station, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Plus amples informationsMUCEM, Marseille, France
Dumez Mediterranée Company (VINCI Group) New construction of the MUCEM (Museum of European and Mediterranean Civilizations) in Marseille, on an area of 26,000 m3
Plus amples informationsToulon Tunnel, France
Tunnelling beneath the city centre of Toulon, length 3310 m, diameter 8.25m
Plus amples informationsClarification plant, Põlgaste, Estonia
Renovation of a clarification plant
Plus amples informationsFlooding, Tartu, Estonia
Pumping water out of a flood zone
Plus amples informationsWaste Water Clarification at Campsite, Croatia
Establishment of a clarification treatment plant for a campsite on Krk Island
Plus amples informations