Lindner-Werke, Dettelbach, Germany
Industrial manufacture of gypsum fibreboard panels
ПодробнееSurface suction removal, Wallenhorst, Germany
Suction withdrawal of foam and floating dirt particles from the surface of the basin
ПодробнееDealer support, Lingen, Germany
Holding of an open day at a key dealership
ПодробнееPump Testing Days, Fürth, Germany
Pump testing days in-house at Gebr. Mayer, electrical and mechanical testing
ПодробнееBibra Tunnel, Germany
The Bibra Tunnel is part of the German Unit No. 8 construction project, the extension stretch on the route Nuremberg-Erfurt-Leipzig-Berlin
ПодробнееOn-site training, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
ПодробнееPumped Storage Power Station, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
ПодробнееMUCEM, Marseille, France
Dumez Mediterranée Company (VINCI Group) New construction of the MUCEM (Museum of European and Mediterranean Civilizations) in Marseille, on an area of 26,000 m3
ПодробнееToulon Tunnel, France
Tunnelling beneath the city centre of Toulon, length 3310 m, diameter 8.25m
ПодробнееClarification plant, Põlgaste, Estonia
Renovation of a clarification plant
ПодробнееFlooding, Tartu, Estonia
Pumping water out of a flood zone
ПодробнееWaste Water Clarification at Campsite, Croatia
Establishment of a clarification treatment plant for a campsite on Krk Island
Подробнее