- Start >
- Polska >
- Raporty zastosowań >
- 2010
2010
Lindner-Werke, Dettelbach, Germany
Industrial manufacture of gypsum fibreboard panels
Czytaj więcejSurface suction removal, Wallenhorst, Germany
Suction withdrawal of foam and floating dirt particles from the surface of the basin
Czytaj więcejDealer support, Lingen, Germany
Holding of an open day at a key dealership
Czytaj więcejPump Testing Days, Fürth, Germany
Pump testing days in-house at Gebr. Mayer, electrical and mechanical testing
Czytaj więcejBibra Tunnel, Germany
The Bibra Tunnel is part of the German Unit No. 8 construction project, the extension stretch on the route Nuremberg-Erfurt-Leipzig-Berlin
Czytaj więcejOn-site training, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Czytaj więcejPumped Storage Power Station, Vianden, Luxemburg
Extension of the pumped storage power station at Vianden with an 11th machine, Lot 1 – Structural installations, Luxemburg
Czytaj więcejMUCEM, Marseille, France
Dumez Mediterranée Company (VINCI Group) New construction of the MUCEM (Museum of European and Mediterranean Civilizations) in Marseille, on an area of 26,000 m3
Czytaj więcejToulon Tunnel, France
Tunnelling beneath the city centre of Toulon, length 3310 m, diameter 8.25m
Czytaj więcejClarification plant, Põlgaste, Estonia
Renovation of a clarification plant
Czytaj więcejFlooding, Tartu, Estonia
Pumping water out of a flood zone
Czytaj więcejWaste Water Clarification at Campsite, Croatia
Establishment of a clarification treatment plant for a campsite on Krk Island
Czytaj więcej