- Start >
- United Kingdom >
- Application reports >
- 2005
2005
ARGE Tunnel Wienerwald, Austria
Construction of a new railway between Vienna and St. Pölten
Read moreARGE tunnel Koralm, Austria
Construction of a new railway between Graz und Klagenfurt
Read moreAntwerp Zoo, Belgium
Aeration of the ditch in the outdoor Siberian tiger enclosure
Read moreGotthard Basistunnel, Switzerland
Railway Tunnel Alptransit Gotthard, Sedrun Section
Read moreKieswerk Hess AG, Switzerland
Pumping off the collecting gravel wash water to the separation system
Read moreRösrath Treatment Plant, Germany
Reconstruction of the sand filter at the Rösrath treatment plant
Read moreARGE tunnel Katzenberg, Germany
Construction of a double-track railway tunnel with a total length of 9.385m
Read moreARGE North-South Urban Railway Cologne, Germany
Construction of the north-south urban railway, Cologne, south section
Read moreNibelungen Bridge Worms, Germany
Construction of second Rhine Bridge
Read moreNordCeram, Germany
Pumping off abrasive ceramic slurry during production
Read moreTrapp GmbH Cologne, Germany
New construction of canal made of site-mixed concrete and liner renovation
Read moreRheinkalk GmbH Wülfrath, Germany
Treatment plant Flandersback, main water drainage
Read more2nd Strelasund Crossing, Stralsund, Germany
Construction of the second Strelasund crossing
Read moreTBG Ready-mix Concrete, Germany
Recycling basin on a ready-mix concrete mixing facility
Read moreARGE Tunnel Tröingeberg, Sweden
Construction of a two-track railway tunnel with a total length of 1.160m
Read moreEast Butterwick Pumpstation, UK
Renovation of a pump station
Read moreARGE tunnel Grouft, Luxemburg
Construction of a road tunnel with a total length of 3.000m
Read moreStorm Flood Gate Maeslantkering, Netherlands
Operating the ballast tank of a storm flood gate
Read moreMink Farm, Netherlands
Pumping of faeces from a mink farm
Read more