- Start >
- United Kingdom >
- Application reports >
- 2008
2008
Energiewerke Nord, Lubmin, Germany
Pumping of residue from thermal groundwater treatment through a filter
Read moreCooling water removal, Germany
Removal of cooling water from a drainage ditch
Read moreRiebel concrete plant, Freimar, Germany
Installation of multiple pumps in the recycling system of the concrete plant
Read moreMoosach subway tunnel, Munich, Germany
Renovation of the U3 between the Olympia shopping centre and Moosach
Read moreRupp gravel plant, Dillingen, Germany
Preparation/clarification of rinse water from gravel processing
Read moreHöllberg A38 tunnel, Thüringen, Germany
Autobahn A38, Breitenworbis-Bleicherode section - construction of the Höllberg tunnel
Read moreBadische Stahlwerke GmbH, Kehl, Germany
Pumping of abrasive and cinder-loaded water
Read moreRenovation of underground parking garage, Munchich, Germany
Pumping of jet water with residual water pumps off concrete surface
Read moreFree training sessions, Germany
Performance of free training for new and existing customers
Read moreAZS ARGE Zugangsstollen, Linthal, Switzerland
Access shafts II - Kraftwerk Linth-Limmern AG - “Project Linthal 2015”
Read moreNEAT Amsteg and Erstfeld construction sites, Switzerland
New Transalpine Railway (NEAT), Amsteg and Erstfeld construction sites
Read moreZagreb Arena, Croatia
Construction of the Zagreb Arena for the 2009 Handball World Championship
Read moreIron depositing, Zwolle, Holland
Deposition of iron using a submersible aerator in Zwolle, Holland
Read moreConstruction of a shopping centre in Oslo, Norway
Construction of a shopping centre at the Port of Oslo
Read moreCaisson tunnel, Oslo, Norway
Construction of a tunnel using caissons
Read moreVinterbro tunnel, Norway
Tunnel on the E6 South section between Vinterbro and Assurtjen, 3605 m in length
Read more